The DPV faces a series of works needed to improve the traffic conditions of different routes and roads south of Mendoza. Most of them are productive and tourist paths. In order to restore the conditions of different routes of San Rafael and General Alvear Malargüe, the Provincial Department of Roads (DPV) began to implement a plan of gradual improvements including roads directly linked to tourism and production side, over the next ten months. The administrator of the DPV, Enrique Soler, said that the program is the starting point for a series of works that are critical to improve the conditions of the road network south of the province, whose total investment amount is around $ 5,700 .000. He added that “this is an important step for the agency, taking into account that all the works included are implemented by management, ie, resources, equipment and own staff Roads” .The plan is already running and to put up has been allocated a specific budget, which includes the following works: access to the site the Board, in Malargüe with an area of 12 kilometers. The work involves the construction of a stabilized primed and sealed base. Access to Las Lenas (Provincial Road No. 222), in Malargüe: Jobs have an area of 50 kilometers, which include patching with asphalt emulsion, profiling the shoulders and signaling recovery. Improved streets C, G, 4 and J in General Alvear: These roads, natural soil and gravel walking that department and Bowen. The works include the construction of a stabilized primed and sealed base. The total area to be covered is more than ten miles. Street Colonels in Table Benegas, San Rafael, four kilometers of stabilized base will be built. Old street in Villa Atuel, San Rafael: the construction of a stabilized primed and sealed in a length of four kilometers is expected basis. Provincial Route No. 179 at Las Malvinas, San Rafael: Six kilometers where the reconstruction of the route will be made by a new asphalt. Calle Las Malvinas, El Cerrito, San Rafael: This is where a new 2.6-kilometer asphalt run. Provincial Route No. 200, on Jaime Prats, San Rafael: a new asphalt will run eight miles. Provincial Route No. 153 Monte Coman-Las Catitas: manual patching work will be done and machining in the alternative to the National N ° 143, which connects San Rafael Mendoza route. Provincial Route No. 171-Monte Real del Padre Comán: manual and mechanized patching will run in a high traffic area that presents serious problems for the deterioration suffered by the stretch in recent years. Provincial Road No. 150, from the National Highway No. 143 (Christ) to the junction with Provincial Highway No. 191: manual and mechanized patching will be performed. Provincial Route No. 191 from the Provincial Highway No. 150 to the National Highway No. 144 (cost of Calves): Expected to run manual and mechanized patching.